User Avatar

The 3 Most Important Documents in a JCT Contract

Lifetime
All levels
2 lessons
1 quiz
1 student

The 3 Most Important Documents in a JCT Contract

At the heart of every JCT Design & Build contract lie three essential documents, each one powerful on its own, but only truly effective when working in harmony. These are:

  • The Contract Sum Analysis (CSA)
  • The Employer’s Requirements (ERs)
  • The Contractor’s Proposals (CPs)

Let’s break them down. What they are, why they matter, and how to keep them aligned.

What Does This Course Entail?

One Video

One Detailed Transcription

Key Points

One Quiz

How Long Will This Course Take?

20 minutes