A take-off is the process of reviewing the drawings and design information for a project and breaking the scope down into individual line items with measured quantities.

Taking off is a core quantity surveying skill. The surveyor works through each drawing systematically, recording dimensions and descriptions for each item of work in accordance with the measurement rules being used, usually NRM2 in the UK. Traditionally this was done by hand on dimension paper and then worked up into an abstract and a bill of quantities. Today most take-offs are carried out with on-screen measurement software or extracted from BIM models, but the principles are the same. A good take-off should:

Related terms: quantify, bill of quantities, material take-off, NRM2.